Build concept

Built with a clear purpose.

This project page presents the build as a standalone KRUG’S product. It explains what was changed, why the airflow matters and how the finished miner should be documented before sale.

V2 enclosure geometry
Fan-focused airflow channel
Clean upright display position
Designed for repeatable assembly

Build certificate

SerialKRG-CASE-V2
WorkshopHamburg, Germany
Burn-in24 hours recommended before sale
StatusQC area prepared
Specifications

Technical presentation.

Base platformBitaxe Gamma 602
CoolingIntegrated fan and airflow duct
Build typeUpgrade case kit
Use caseCooling and appearance upgrade
Performance evidence

Screenshots and burn-in results.

Build process

From board to KRUG’S build.

01

Base inspection.
The board, connectors and cooling contact points are visually checked before assembly.

02

Cooling and airflow assembly.
The enclosure, fan path and heatsink layout are assembled for stable continuous operation.

03

Burn-in and documentation.
The miner should be tested under real load and documented with hashrate, temperature and efficiency data.